Waiting times / Druge urodinamske preiskave

Druge urodinamske preiskave service code 2084

Urgency on the referralRegularFastVery fast

    Shortest wait · all of Slovenia

    2 days

    UKC Ljubljana Kirurška Klinika · Ljubljana

    Median
    116 days
    Legal maximum
    93 days
    Providers
    8
    maximum 93median 1160100200300
    • 1 provider up to 31 days
    • 2 32 to 93 days (within the legal maximum)
    • 5 over the legal maximum (93 days)
    • 2 no date (call them)

    Each dot is one provider; the axis is days. 2 without a date are not on the axis. 5 providers are over the legal maximum.

    Where is it fastest?

    Shortest wait by region
    Map of regions, coloured by the shortest wait in each regionGorenjska: no providerGoriška: shortest 57 days (Splošna Bolnišnica dr. Franca Derganca Nova Gorica, Šempeter - vrtojba), 1 providerJugovzhodna Slovenija: no providerKoroška: shortest 347 days (Splošna Bolnišnica Slovenj Gradec, Slovenj gradec), 1 providerObalno-kraška: no providerOsrednjeslovenska: shortest 2 days (UKC Ljubljana Kirurška Klinika, Ljubljana), 3 providersPodravska: shortest 116 days (Splošna Bolnišnica dr. Jožeta Potrča Ptuj, Ptuj), 2 providersPomurska: shortest 116 days (Splošna Bolnišnica Murska Sobota, Murska sobota), 1 providerPosavska: no providerPrimorsko-notranjska: no providerSavinjska: no providerZasavska: no provider
    03193 maxmoreNumber = the shortest wait in the region (days). Click a region for its providers. All providers in the public network are included, also private ones with a concession; with a referral you pay nothing. no provider
    1. OsrednjeslovenskaUKC Ljubljana Kirurška Klinika, Ljubljana2 days
    2. GoriškaSplošna Bolnišnica dr. Franca Derganca Nova Gorica, Šempeter - vrtojba57 days
    3. PodravskaSplošna Bolnišnica dr. Jožeta Potrča Ptuj, Ptuj116 days
    4. PomurskaSplošna Bolnišnica Murska Sobota, Murska sobota116 days
    5. KoroškaSplošna Bolnišnica Slovenj Gradec, Slovenj gradec347 days
    6. Gorenjskano provider–
    7. Jugovzhodna Slovenijano provider–
    8. Obalno-kraškano provider–
    9. Posavskano provider–
    10. Primorsko-notranjskano provider–
    11. Savinjskano provider–
    12. Zasavskano provider–

    Providers, shortest wait first

    fast · as of 18 Nov 2026
    1. 1
      UKC Ljubljana Kirurška Klinika
      Ljubljana
      2 daysslot around 20 Nov 2026within the max
    2. 2
      Splošna Bolnišnica dr. Franca Derganca Nova Gorica
      Šempeter pri gorici, Šempeter - vrtojba
      57 daysslot around 14 Jan 2027within the max
    3. 3
      UKC Ljubljana Ginekološka Klinika
      Ljubljana
      88 daysslot around 14 Feb 2027close to the max
    4. 4
      Splošna Bolnišnica dr. Jožeta Potrča Ptuj
      Ptuj
      116 daysslot around 14 Mar 202723 days over the max02 749 14 00
    5. 5
      Splošna Bolnišnica Murska Sobota
      Rakičan, Murska sobota
      116 daysslot around 14 Mar 202723 days over the max02 512 31 09
    6. 6
      UKC Ljubljana Nevrološka Klinika
      Ljubljana
      224 daysslot around 30 Jun 2027131 days over the max
    7. 7
      Univerzitetni Klinični Center Maribor
      Maribor
      224 daysslot around 30 Jun 2027131 days over the max02 321 10 00
    8. 8
      Splošna Bolnišnica Slovenj Gradec
      Slovenj gradec
      347 daysslot around 31 Oct 2027254 days over the max02 882 34 00
    9. –
      Splošna Bolnišnica Celje
      Celje
      No date: “prosti sprejem” (open admission), or they don’t take this urgency. Call them.
      no date03 423 30 00
    10. –
      Splošna Bolnišnica Novo Mesto
      Novo mesto
      No date: “prosti sprejem” (open admission), or they don’t take this urgency. Call them.
      no date07 391 61 00

    Book on the national eNaročanje portal with your referral number, or call the provider.

    Open eNaročanje

    Is the wait getting longer?

    Median of all providers: 133 days (Nov 2026), a year earlier 133 days +0%. When the data starts (Apr 2024) 122 days.

    0100200Apr 2024Jan 2025Jan 2026Nov 2026
    • median of all providers
    • fastest provider
    • legal maximum (93 days)

    Days, as of the first day of each month, fast. The cakalne-dobe project, 2024-04..2026-11.

    Good to know