Waiting times / MR torakalne hrbtenice

MR torakalne hrbtenice service code 1766

Urgency on the referralRegularFastVery fast
  • Podravska
Show all of Slovenia

Shortest wait · Podravska

11 days

MTC Fontana d.o.o. · Maribor

Median
26 days
Legal maximum
93 days
Providers
6 of 21
maximum 93median 260306090120150180
  • 3 providers up to 31 days
  • 2 32 to 93 days (within the legal maximum)
  • 1 over the legal maximum (93 days)
  • 1 no date (call them)

Each dot is one provider; the axis is days. 1 without a date is not on the axis. 1 provider is over the legal maximum.

Where is it fastest?

Shortest wait by region · clear filter
Map of regions, coloured by the shortest wait in each regionGorenjska: shortest 73 days (Splošna Bolnišnica Jesenice, Jesenice), 2 providersGoriška: shortest 115 days (Splošna Bolnišnica dr. Franca Derganca Nova Gorica, Šempeter - vrtojba), 1 providerJugovzhodna Slovenija: shortest 101 days (Splošna Bolnišnica Novo Mesto, Novo mesto), 1 providerKoroška: shortest 25 days (Splošna Bolnišnica Slovenj Gradec, Slovenj gradec), 1 providerObalno-kraška: shortest 146 days (Splošna Bolnišnica Izola Ospedale Generale Isola, Izola/isola), 2 providersOsrednjeslovenska: shortest 73 days (Medilab d.o.o., Diagnosticni Radiološki Center, Ljubljana), 3 providersPodravska: shortest 11 days (MTC Fontana d.o.o., Maribor), 7 providersPomurska: shortest 56 days (Splošna Bolnišnica Murska Sobota, Murska sobota), 1 providerPosavska: shortest 146 days (Splošna Bolnišnica Brežice, Brežice), 1 providerPrimorsko-notranjska: no providerSavinjska: shortest 162 days (Splošna Bolnišnica Celje, Celje), 1 providerZasavska: shortest 101 days (Splošna Bolnišnica Trbovlje, Trbovlje), 1 provider
03193 maxmoreNumber = the shortest wait in the region (days). Click a region for its providers. All providers in the public network are included, also private ones with a concession; with a referral you pay nothing. no provider
  1. PodravskaMTC Fontana d.o.o., Maribor11 days
  2. KoroškaSplošna Bolnišnica Slovenj Gradec, Slovenj gradec25 days
  3. PomurskaSplošna Bolnišnica Murska Sobota, Murska sobota56 days
  4. GorenjskaSplošna Bolnišnica Jesenice, Jesenice73 days
  5. OsrednjeslovenskaMedilab d.o.o., Diagnosticni Radiološki Center, Ljubljana73 days
  6. Jugovzhodna SlovenijaSplošna Bolnišnica Novo Mesto, Novo mesto101 days
  7. ZasavskaSplošna Bolnišnica Trbovlje, Trbovlje101 days
  8. GoriškaSplošna Bolnišnica dr. Franca Derganca Nova Gorica, Šempeter - vrtojba115 days
  9. Obalno-kraškaSplošna Bolnišnica Izola Ospedale Generale Isola, Izola/isola146 days
  10. PosavskaSplošna Bolnišnica Brežice, Brežice146 days
  11. SavinjskaSplošna Bolnišnica Celje, Celje162 days
  12. Primorsko-notranjskano provider–

Providers, shortest wait first

fast · as of 19 Nov 2026
  1. 1
    MTC Fontana d.o.o.
    Maribor
    11 daysslot around 30 Nov 2026within the max02 234 41 24
  2. 2
    Digitalna Slikovna Diagnostika, d.o.o.
    Ptuj
    20 daysslot around 9 Dec 2026within the max02 772 07 31
  3. 3
    Splošna Bolnišnica dr. Jožeta Potrča Ptuj
    Ptuj
    26 daysslot around 15 Dec 2026within the max02 749 14 00
  4. 4
    Univerzitetni Klinični Center Maribor
    Maribor
    56 daysslot around 14 Jan 2027within the max02 321 10 00
  5. 5
    Zdravstveni Dom dr. Adolfa Drolca Maribor
    Maribor
    69 daysslot around 27 Jan 2027within the max02 228 62 00
  6. 6
    Radiomed d.o.o.
    Spodnje hoče, Hoče - slivnica
    176 daysslot around 14 May 202783 days over the max041 370 938051 227 400
  7. –
    MDT, Podjetje za Medicinsko Diagnostiko, Terapijo in Tehnologijo, d.o.o.
    Maribor
    No date: “prosti sprejem” (open admission), or they don’t take this urgency. Call them.
    no date02 235 35 5202 235 35 53

Book on the national eNaročanje portal with your referral number, or call the provider.

Open eNaročanje

Is the wait getting longer?

Median of all providers: 105 days (Nov 2026), a year earlier 91 days +15%. When the data starts (Apr 2024) 54 days.

050100Apr 2024Jan 2025Jan 2026Nov 2026
  • median of all providers
  • fastest provider
  • legal maximum (93 days)

Days, as of the first day of each month, fast. The cakalne-dobe project, 2024-04..2026-11.

Good to know